Instructions:
1. DEMOLITION: Demolish partition walls, dismantle the false ceiling and unused installations, and remove the textured wall finish (gotelé) from walls, pillars, and the access staircase.
2. INTERVENTION: Paint the floor with satin white polyurethane, install exposed industrial-style services, provide lighting with 15 points (sockets with clear incandescent bulbs) arranged irregularly at different heights, and add living-room-style lamps in the lounge and meeting table areas.
3. OCCUPATION: Organize the work zones with black-lacquered modular USM furniture, and create a rest/meeting/lounge area by reusing the client’s existing furniture and artwork.